A customer from South Carolina contacted BlastOne seeking a solution to an urgent, difficult blasting challenge.
The US Military commissioned the client to blast one of their oil storage tanks. However, the project deadline was only two weeks.
OBJECTIVE
Previous work cleaning these tanks had always taken three weeks of solid blasting. Plus he always used a minimum of 10 truckloads of abrasive. The customer ordered new high-performance blasting equipment from BlastOne and 10 truckloads of GemBlast Abrasive.
RESULTS
BlastOne sent an application engineer to ensure maximum results from GemBlast. Additionally, we wanted to ensure this important project started without any hiccups. The contactor called BlastOne just 13 days later to say the project was finished 10% ahead of the US military’s demanding schedule.
Used half the amount of abrasive
Lowered overall blasting cost by 25%
Project finished 10% ahead of schedule
CONCLUSION
Overall, the project cost 25% less than what our client budgeted. There was five spare truckloads of GemBlast abrasive that he didn’t use. BlastOne told him to simply send it back and the unused portion would be deducted from his bill.
“The boss made so much money on that project because he finished early that he handed out bonus checks like never before!”
EXPERIENCE THE BENEFITS
HIGH PRODUCTIVITY
Superior cleaning rate against other abrasives.
COST EFFECTIVE
Lower garnet usage, labor, clean up and disposal cost.
SAFER TO USE
Meets industry, government and environmental safety standards.
CASE STUDIES
Contact BlastOne
We love to talk to customers and help them make the best decisions when purchasing equipment.
You can reach us via our Live Chat, Email, Phone, and Online Form.